Case Study


New sieve installation improves product quality and increases plant capacity
Our client, a large animal feed mill in Lancashire was looking at ways to improve the quality of its pellets and rolls for animal feed and also handle the plant’s capacity at the same time.
We designed a system which incorporated two new Mogensen Sieves, each rated at 25 tonnes per hour, a higher rating than the mill’s existing ones, which were struggling to cope with the throughput.
However, the location of the sieves was at the top of the mill and the building required modification to install and accommodate them. Our solution was to design and build a new penthouse roof to cover the new system. The sieves had to be installed using a crane though the roof and the installation was carried out over a continuous 36 hour shutdown period to minimise the effects on plant production.
Process Machinery and installation service
Design, manufacture and install components for materials handling process industries
Design and project management
Design and end to end management of the complete project
Specialist steel fabrications
From concept to production